§ 39-55. Separate service connection for each lot.
Latest version.
A separate connection shall be required for each subdivision lot upon which a building is constructed. Only one sewer service connection will be required where multiple lots are used to construct a building.
(Code 1959, § 32-28; Ord. No. O-87-265, § 1, 11-24-87, eff. 1-1-88)
(Code 1959, § 32-28; Ord. No. O-87-265, § 1, 11-24-87, eff. 1-1-88)